ADIDAS DINSEN PROJECT

We follow all the requirements for ADIDAS DINSEN PROJECT and even more

INFORMATION ABOUT THE PROJECT

SYSTEM POWER : 1000 Kw

PV MODULES INSTALLED: 2700

CONSTRUCTION DURATION : 1 Month

ESTIMATED PRODUCTION PER YEAR : 1.480.000 Kwh

vc-pie-hide-icon

Energy Efficiency Reached

As a Result of the Energy Efficiency Reached
vc-pie-hide-icon

Roof Surface Cover by Solar Panels

As a result of the Roof Surface Covered by Solar Panels
vc-pie-hide-icon

European Standard Used

As a result of the Total European Standard Used

Supervision  Contract

  • SITE MANAGEMENT
  • QUALITY CONTROL
  • CONSTRUCTION SUPERVISION
  • COMMISSIONING

LOCATION : Long An District

GET A FREE QUOTATION TODAY

First if all COMPILE all the information necessary to Get a reliable FREE SOLAR QUOTATION and even more.

CONSUMPTION as a result of the Energy used in KWh per month.

ROOF SURFACE as a result of the Dimension of the Roof  in sqm.

ROOF TYPE as a result of the Type is FLAT or PITCHED.

LOCATION as a result of the City where you desire to install.



Installation for (Required)

Enter Your Message to clarify the details of the Request

  • Clients:
    Dinsen Long An Co. Ltd.
  • Shares