CRAIGWOOD FACTORY PROJECT

In conclusio CRAIGWOOD FACTORY PROJECT and even more

WORLD MATE HOSPITAL PROJECT

INFORMATION ABOUT THE PROJECT

SYSTEM POWER : 100 Kw

PV MODULES INSTALLED: 300

CONSTRUCTION DURATION : 2 Weeks

vc-pie-hide-icon

Energy Efficiency Reached

As a Result of the Energy Efficiency Reached
vc-pie-hide-icon

Roof Surface Cover by Solar Panels

As a result of the Roof Surface Covered by Solar Panels
vc-pie-hide-icon

European Standard Used

As a result of the Total European Standard Used

FEDERICO BESTIANI as PROJECT MANAGER

  • SITE MANAGEMENT
  • QUALITY CONTROL
  • CONSTRUCTION SUPERVISION
  • COMMISSIONING

LOCATION : PHNOM PENH (Cambodia)

GET A FREE QUOTATION TODAY

First if all COMPILE all the information necessary to Get a reliable FREE SOLAR QUOTATION and even more.

CONSUMPTION as a result of the Energy used in KWh per month.

ROOF SURFACE as a result of the Dimension of the Roof  in sqm.

ROOF TYPE as a result of the Type is FLAT or PITCHED.

LOCATION as a result of the City where you desire to install.



Installation for (Required)

Enter Your Message to clarify the details of the Request