DUC MINH FACTORY PROJECT
In conclusion DUC MINH FACTORY PROJECT and even more
INFORMATION ABOUT THE PROJECT
SYSTEM POWER : 125 Kw
PV MODULES INSTALLED: 380
CONSTRUCTION DURATION : 2 Weeks
ESTIMATED PRODUCTION PER YEAR : 180.560 Kwh
vc-pie-hide-icon
Energy Efficiency Reached
As a Result of the Energy Efficiency Reached
vc-pie-hide-icon
Roof Surface Cover by Solar Panels
As a result of the Roof Surface Covered by Solar Panels
vc-pie-hide-icon
European Standard Used
As a result of the Total European Standard Used

Bestiani Engineering Company Contract
- PROJECT DESIGN
- ENGINEERING
- CONSTRUCTION
- COMMISSIONING
- MAINTEANCE
LOCATION : Hoc Mon District
GET A FREE QUOTATION TODAY
First if all COMPILE all the information necessary to Get a reliable FREE SOLAR QUOTATION and even more.
CONSUMPTION as a result of the Energy used in KWh per month.
ROOF SURFACE as a result of the Dimension of the Roof in sqm.
ROOF TYPE as a result of the Type is FLAT or PITCHED.
LOCATION as a result of the City where you desire to install.