Extremadura Project
In Conclusion Extremadura Project and even more
INFORMATION ABOUT THE PROJECT
SYSTEM POWER : 50 Mw
CONSTRUCTION DURATION : 8 Months
vc-pie-hide-icon
Energy Efficiency Reached
As a Result of the Energy Efficiency Reached
vc-pie-hide-icon
Delay on the Scheduled Goal Date
As a result of Total delay on the Scheduled goal date
vc-pie-hide-icon
European Standard Used
As a result of the Total European Standard Used

ANDREAS ILIOU as COMMISSIONING MANAGER
- SITE MANAGEMENT
- QUALITY CONTROL
- CONSTRUCTION SUPERVISION
- COMMISSIONING
LOCATION : Extremadura (Spain)
GET A FREE QUOTATION TODAY
First if all COMPILE all the information necessary to Get a reliable FREE SOLAR QUOTATION and even more.
CONSUMPTION as a result of the Energy used in KWh per month.
ROOF SURFACE as a result of the Dimension of the Roof in sqm.
ROOF TYPE as a result of the Type is FLAT or PITCHED.
LOCATION as a result of the City where you desire to install.