KIM KHANH GIANG GOLD SHOP
In conclusion KIM KHANH GIANG GOLD SHOP and even more
INFORMATION ABOUT THE PROJECT
SYSTEM POWER : 6.7 Kw
PV MODULES INSTALLED: 20
CONSTRUCTION DURATION : 2 Days
vc-pie-hide-icon
Energy Efficiency Reached
As a Result of the Energy Efficiency Reached
vc-pie-hide-icon
Roof Surface Cover by Solar Panels
As a result of the Roof Surface Covered by Solar Panels
vc-pie-hide-icon
European Standard Used
As a result of the Total European Standard Used

Bestiani Engineering Company Contract
- PROJECT DESIGN
- ENGINEERING
- CONSTRUCTION
- COMMISSIONING
- MAINTEANCE
LOCATION : District 11