KIM SEN GOLD SHOP

In conclusion KIM SEN GOLD SHOP and even more.

KIM SEN GOLD SHOP

Bestiani Engineering Company was in charge as Installer and Designer of the System. We proceed with our Construction Team on site, Commissioning the System and we start up installing the Inverter App in order to check the System Status by the Client and even more. At the Moment we finalized the Installation we help the client to apply trough EVN for the Government Incentives.
Here you can find all the informations about this Project and even more:

SYSTEM POWER : 7 Kw

PV MODULES INSTALLED: 21

CONSTRUCTION DURATION : 2 Days

vc-pie-hide-icon

Energy Efficiency Reached

As a Result of the Energy Efficiency Reached
vc-pie-hide-icon

Roof Surface Cover by Solar Panels

As a result of the Roof Surface Covered by Solar Panels
vc-pie-hide-icon

European Standard Used

As a result of the Total European Standard Used

Bestiani Engineering Company Contract

  • PROJECT DESIGN
  • ENGINEERING
  • CONSTRUCTION
  • COMMISSIONING
  • MAINTEANCE

LOCATION : District 11

GET A FREE QUOTATION TODAY

First if all COMPILE all the information necessary to Get a reliable FREE SOLAR QUOTATION and even more.

CONSUMPTION as a result of the Energy used in KWh per month.

ROOF SURFACE as a result of the Dimension of the Roof  in sqm.

ROOF TYPE as a result of the Type is FLAT or PITCHED.

LOCATION as a result of the City where you desire to install.



Installation for (Required)

Enter Your Message to clarify the details of the Request