KIM SEN GOLD SHOP
In conclusion KIM SEN GOLD SHOP and even more.
KIM SEN GOLD SHOP
Bestiani Engineering Company was in charge as Installer and Designer of the System. We proceed with our Construction Team on site, Commissioning the System and we start up installing the Inverter App in order to check the System Status by the Client and even more. At the Moment we finalized the Installation we help the client to apply trough EVN for the Government Incentives.
Here you can find all the informations about this Project and even more:
SYSTEM POWER : 7 Kw
PV MODULES INSTALLED: 21
CONSTRUCTION DURATION : 2 Days
Energy Efficiency Reached
Roof Surface Cover by Solar Panels
European Standard Used

Bestiani Engineering Company Contract
- PROJECT DESIGN
- ENGINEERING
- CONSTRUCTION
- COMMISSIONING
- MAINTEANCE
LOCATION : District 11
GET A FREE QUOTATION TODAY
First if all COMPILE all the information necessary to Get a reliable FREE SOLAR QUOTATION and even more.
CONSUMPTION as a result of the Energy used in KWh per month.
ROOF SURFACE as a result of the Dimension of the Roof in sqm.
ROOF TYPE as a result of the Type is FLAT or PITCHED.
LOCATION as a result of the City where you desire to install.