WORLD MATE HOSPITAL PROJECT
In conclusion WORLD MATE HOSPITAL PROJECT and even more.
WORLD MATE HOSPITAL PROJECT
First of all here you can find all the information about the project. Federico Bestiani was in charge as Project Manager and he took care about every aspects of the Installation. He managed the Team on site and he ensured that the delivery arrived on time and even more. Thanks to his Coordination and experience the Installation finished in time.
INFORMATION ABOUT THE PROJECT
SYSTEM POWER : 81 Kw
PV MODULES INSTALLED: 250
CONSTRUCTION DURATION : 3 Weeks
Energy Efficiency Reached
Roof Surface Cover by Solar Panels
European Standard Used

FEDERICO BESTIANI as PROJECT MANAGER
- SITE MANAGEMENT
- QUALITY CONTROL
- CONSTRUCTION SUPERVISION
- COMMISSIONING
LOCATION : BATTAMBANG (Cambodia)
GET A FREE QUOTATION TODAY
First if all COMPILE all the information necessary to Get a reliable FREE SOLAR QUOTATION and even more.
CONSUMPTION as a result of the Energy used in KWh per month.
ROOF SURFACE as a result of the Dimension of the Roof in sqm.
ROOF TYPE as a result of the Type is FLAT or PITCHED.
LOCATION as a result of the City where you desire to install.