WORLD MATE HOSPITAL PROJECT

In conclusion WORLD MATE HOSPITAL PROJECT and even more.

WORLD MATE HOSPITAL PROJECT

WORLD MATE HOSPITAL PROJECT

First of all here you can find all the information about the project. Federico Bestiani was in charge as Project Manager and he took care about every aspects of the Installation. He managed the Team on site and he ensured that the delivery arrived on time and even more. Thanks to his Coordination and experience the Installation finished in time.

INFORMATION ABOUT THE PROJECT

SYSTEM POWER : 81 Kw

PV MODULES INSTALLED: 250

CONSTRUCTION DURATION : 3 Weeks

vc-pie-hide-icon

Energy Efficiency Reached

As a Result of the Energy Efficiency Reached
vc-pie-hide-icon

Roof Surface Cover by Solar Panels

As a result of the Roof Surface Covered by Solar Panels
vc-pie-hide-icon

European Standard Used

As a result of the Total European Standard Used

FEDERICO BESTIANI as PROJECT MANAGER

  • SITE MANAGEMENT
  • QUALITY CONTROL
  • CONSTRUCTION SUPERVISION
  • COMMISSIONING

LOCATION : BATTAMBANG (Cambodia)

GET A FREE QUOTATION TODAY

First if all COMPILE all the information necessary to Get a reliable FREE SOLAR QUOTATION and even more.

CONSUMPTION as a result of the Energy used in KWh per month.

ROOF SURFACE as a result of the Dimension of the Roof  in sqm.

ROOF TYPE as a result of the Type is FLAT or PITCHED.

LOCATION as a result of the City where you desire to install.



Installation for (Required)

Enter Your Message to clarify the details of the Request

  • Shares